Current project
- Ground floor
- 4,000 m²
- Suspended slabs
- 4,000 m²
- Concrete
- Approx. 800 m³
- Focus
- Integrated structure
- Location
- Fingal, Victoria
Precision from the ground up.
Experience of the BOW Structures and BOW Projects team prior to BOW. These projects are not BOW contracts.
The BOW Structures profile highlights Alba within the team’s project experience. The scope includes a retention system, screw piles, a slab on ground, two suspended slabs and precast installation.
The profile describes a 4,000 m² ground floor, raft slab and foundations incorporating CFA and screw piles, approximately 800 m³ of concrete, and 4,000 m² of suspended post-tensioned slabs.
Scope delivered by the team
- Retention system, screw and CFA piles
- Raft slab
- Two suspended post-tensioned slabs
- Precast installation