Current project
- Floor plate
- 3,600 m²
- Basements
- 2
- Above-ground levels
- 5
- Structure
- Post-tensioned slabs
- Location
- 60 Belgrave Road, Malvern East
Complex below ground. Considered above it.
Experience of the BOW Structures and BOW Projects team prior to BOW. These projects are not BOW contracts.
The BOW Structures profile presents Hedgeley as a project experience case study covering double-basement design and construction, a triple-level car stacker, post-tensioned slabs and precast installation.
The profile describes a 3,600 m² floor plate, two basements and five levels. Works include retention piles, shotcrete, a hydrostatic slab, foundation piles, a transfer slab and post-tensioned floor slabs.
Scope delivered by the team
- Double basement and triple-level car stacker
- Retention piles, shotcrete and hydrostatic slab
- Post-tensioned transfer and floor slabs
- Precast panels